PROJECT DESCRIPTION: LED SHOP LIGHT INSTALLATION – FORT MYERS, FL
We completed a two-day LED lighting upgrade for a commercial shop facility. The goal was to improve visibility and energy efficiency using high-lumen fixtures while keeping the workspace accessible during the install.
WHAT WE DID:
- Provided and installed (20) BOLT® 96” LED shop lights – each with 6 lamps and 18,600 lumens
- Suspended fixtures from the ceiling to hang precisely 10 feet above the floor
- Wired all lights into the existing lighting system for seamless integration
- Installed 10 fixtures per bay across two bays
- Completed the job in two days, giving the customer access to one bay per day to avoid workflow disruption
THE RESULT:
The shop now has bright, even lighting that significantly improves workspace visibility while reducing power consumption. By using high-output BOLT® LED fixtures, we ensured long-term performance and durability. The phased install allowed the business to stay operational throughout.
FREQUENTLY ASKED QUESTIONS
- How long did the install take?
We completed the entire job in two days—one bay per day. - Were existing electrical systems reused?
Yes, we tied the new LED fixtures into the shop’s existing lighting infrastructure. - What’s the mounting height of the fixtures?
Each fixture was suspended to hang exactly 10 feet from the floor for optimal lighting. - What type of lights were installed?
BOLT® 96” LED shop lights with 6 lamps and a clear lens, rated at 18,600 lumens per fixture. - Was the shop closed during installation?
No, we kept one bay accessible each day to minimize downtime for the client.
Gallery









